Browse Additional Project Images

Key Project Figures

Project Services:

  • Engineer of Record
  • Tilt-up Panel Specialty Engineer
  • Tilt-up Panel Layout Shop Drawings
  • Tilt-up Panel Reinforcing Placing Drawings
  • Tilt-up Panel Lifting and Bracing

Year Completed:
2018

Gross Project Area:
26,529 sf

Gross Tilt-up Panel Area:
18,811 sf

Quantity of Tilt-up Panels:
37 Total
30 Typical

Heaviest Tilt-up Panel:
64,800 lbs

Total Tilt-up Panel Concrete Volume:
358 yards

Total Tilt-up Panel Reinforcing:
19 tons
2.0 lbs/gsf (Grade 60)